Lux Estates
Brick storefront and sage-gray cottage beside a small landscaped courtyard on a sunny late-autumn day in a Colorado small town.

Monument Adopted a Downtown Plan. A Different Council Will Write the Rules.

At the corner of Front Street and 3rd Street in Historic Downtown Monument, there's a bike shop surrounded by vacant land. In the town's new Downtown Master Plan, the same corner holds a three-story building with 60 homes upstairs, about 20,000 square feet of shops on the ground floor, rooftop amenities and a public gathering space.

The drawing is now official town policy. The Monument Town Council adopted the Monument 2040 Comprehensive Plan and its Downtown Master Plan on November 2, 2026, by four votes to three. The drawing also has no legal force. Adopting the plan approves no project and rezones no land. The binding part is the town's Land Development Code, and according to The Monument Independent's account of the November 2 meeting, staff expect to bring amendments to it early in 2027. On November 3, the night after the vote, Monument elected a new mayor. He was one of the three council members who voted no.

The plan shows where the town wants to go. The council that writes the code will be led by someone who voted against the plan.

Why downtown has looked the same since 1995

The plan is unusually direct about how little has changed downtown. The study area holds about 83,500 square feet of retail. Its median year built is 1959, the average building is roughly 3,340 square feet, and nothing new has been built for retail downtown since 1995. Before the recently completed mixed-use project at 231 Front Street, the whole district had 10 apartments. According to The Monument Independent's guide to the draft plan, only about 14 percent of the roughly 823,000 visits downtown each year come from people who live in Monument.

The plan traces the stagnation to the rules rather than to demand. Downtown, multifamily housing is a conditional use, and the code sets no residential density in the Downtown Business district or in the Commercial Center district next to it. The only district in town that allows multifamily outright covers 30.94 acres, which is under 1 percent of Monument. The plan says an applicant downtown "may have to go through a lengthy application and review process only to be told no." Across town, 57 percent of the land is zoned Planned Unit Development, a designation the plan says is "not defined in the municipal code."

The plan's answer appears as Goal 7 of the Downtown Master Plan. Amend the Downtown Business zone to set by-right density for multifamily and mixed-use buildings, allow multifamily housing by right "rather than a conditional use," and update residential parking requirements to match current practice. Apartments over shops downtown, like the Front and 3rd sketch, are what these amendments are meant to make possible. None of them exists yet.

What the plan draws, and what is there now

The Downtown Master Plan names three opportunity sites. Each one shows what the code rewrite would have to permit.

Site What is there today What the plan sketches
Front Street and 3rd Street A bike shop surrounded by vacant land Three stories, 60 homes over about 20,000 sq ft of commercial space, 40 internal parking spaces plus 19 on-street
2nd Street gateway, near Highway 105 Two underused lots on either side of 2nd Street, next to the Santa Fe Regional Trail and Dirty Woman Creek open space A 4.5-story, 140-apartment building, 36 rowhomes, retail, a trail-connected pocket park, 151 parking spaces for the apartments
Lewis-Palmer School District 38 property About 30 acres holding the district's bus fleet and two town baseball fields Named as an opportunity site, with no drawing

The gateway concept gets the most attention. Its retail adds up to a 20,000-square-foot anchor and 60,000 square feet along 2nd Street, and the plan itself records that the 140-unit building "received mixed feedback." People saw a benefit in more residents downtown but questioned the density and whether the site was right for it. Both plan documents call the drawings conceptual.

The parts of the plan that need no rezoning are smaller and closer to street level. They include a lighting plan for Limbach Park, priority lighting on Front Street, possible decorative lighting on 2nd Street, and bicycle parking at Limbach Park and the Santa Fe Trailhead Park. The plan also calls for a signed route from downtown to Monument Lake, talks with the railroad about a protected crossing or underpass at 2nd Street, filling sidewalk gaps such as Adams Street south of 2nd Street, and clearer signs to existing parking lots before the town builds new ones. These are the changes a resident near downtown is most likely to see first.

A 4–3 vote, then an election

The plan's timing had a fixed deadline behind it. As The Monument Independent reported from the November 2 meeting, drafting was paid for partly by a $200,000 planning grant from the Colorado Department of Local Affairs, split equally with the town. The grant terms required adoption by December 31, 2026, and staff told the council the town could have to return money it had received if adoption slipped. Mayor Mitch LaKind and council members Marco Fiorito, Laura Kronick and Chad Smith voted yes. Mayor Pro Tem Steve King and council members Sana Abbott and Kenneth Kimple voted no. King had asked the council to drop the plan's support for multifamily housing by right downtown, and no amendment was moved.

The next day, Kimple won the mayor's race over Kronick, 3,587 votes to 2,224, or 61.7 percent to 38.3 percent, in the El Paso County count reported by The Monument Independent. Those results stay unofficial until the county certifies them by November 25. Three of the four council members chosen in the election will be new to the council, and Kimple takes office in January, succeeding LaKind, who did not run again.

After the election, Kimple told The Gazette that updating the town's land-use and zoning codes is a priority, to encourage responsible growth while attracting new businesses and supporting existing small-business owners. He said his administration would build on the work of the current council and staff. Both sides of the November 2 vote agree the code needs rewriting. What remains open is the content of that rewrite, especially whether apartments become a by-right use downtown. Planning Director Dan Ungerleider said the council would take part in rewriting the code.

Where new housing actually got approved this year

Whatever the plan says about downtown, the clearest sign of what gets built in Monument came in August, at a site the plan's drawings don't cover. On August 17, the council voted 7–0 to approve Hillpointe, formally Conexus Lot 1 Filing 2. It puts 312 two-bedroom apartments and 42 three-bedroom townhomes on 19.06 acres between the realigned Old Denver Road and I-25. According to The Monument Independent's account of that meeting, the project came in under almost every limit its 2022 preliminary plan allowed. Density is 18.57 units per acre against 20.89 allowed, and the buildings stand under 42 feet against a 75-foot limit. The same report says nothing in the approval legally restricts rents.

Hillpointe passed easily because its entitlement already existed. Every Town Council and Board of Trustees vote in the Conexus entitlement history was unanimous.

Monument's housing is weighted so heavily toward one type. The regional assessment behind the plan puts the shortfall at 824 units now and 691 more over ten years, in a housing stock that is 76 percent single-family detached. Across El Paso County in October 2026, according to Pikes Peak REALTOR Services Corp., the median single-family and patio home sold for $475,000, unchanged from October 2025. The median condo or townhome sold for $330,000. Those are countywide figures, and the gap between them is the price tier that downtown Monument's 10 apartments and older storefronts have mostly left empty. The code rewrite will decide whether downtown can add homes in that tier or whether new attached housing keeps landing on existing PUD sites near the interstate.

What to watch before you commit near downtown

For a buyer looking at Historic Downtown, the streets west of Front Street, or the 2nd Street corridor between I-25 and Beacon Lite Road, the next year has specific checkpoints.

  1. The Land Development Code amendments in early 2027. Watch the Downtown Business district, the treatment of multifamily housing, and residential parking.
  2. The December council calendar. Adoption of the 2027 budget is set for December 7, with a special meeting on December 14 for the mill levy. Meetings are at Monument Town Hall, 645 Beacon Lite Road, at 6:30 p.m.
  3. Jackson Creek Parkway. The funded first phase adds northbound lanes between Higby Road and Fat Tire Drive. It was expected to go to bid in late November or December, with construction in 2027 and completion in spring or mid-2028.
  4. The housing action plan. State law requires one, and the plan schedules its adoption by January 1, 2028.

FAQ

Did the Monument 2040 plan rezone any property? No. Town staff said adoption approves no project, rezones no land and gives staff no new authority to approve development administratively.

Will the 140-apartment building at the 2nd Street gateway be built? It's a conceptual drawing. No project for the site has been approved.

How often will the plan be reviewed? Staff said it will be reviewed every year, with a fuller review in about five years.

This post is general information about public planning documents and is not legal advice. Anyone weighing how zoning affects a particular property should confirm the details with the town and the appropriate professional.

If you're weighing a home near Historic Downtown Monument, Drake Guidry and the Lux Estates team can help. Schedule a Consultation.

Let’s Get Started

Real estate isn’t about transactions — it’s about transformation. Let’s elevate your next move.

Follow Me on Instagram