In August 2026, the Town of Monument and Donala Water and Sanitation District both voted to leave the El Paso County Regional Loop Water Authority. That left Woodmoor Water and Sanitation District as the only member of a four-party renewable water project that started in November 2022. By its September 24 meeting, the authority was preparing for final dissolution in 2027.
For someone comparing homes in Monument, the breakup changed one thing listings rarely show: which water provider serves a house. Before this summer, three of the area's providers were working toward the same pipeline. Now each one is on its own plan, at its own stage, with its own way of passing costs to customers. Two homes at the same price, a few miles apart, may be served by providers that are years apart in getting off non-renewable groundwater.
The line item that comes with the parcel
Water service in Monument depends on the exact parcel, so a neighborhood name or a ZIP code won't tell you who serves a house. Woodmoor's district map shows boundaries, subdivisions and individual lots. That's the level where a buyer needs to check. Triview Metropolitan District has its own district map. Triview also has developer-created subdistricts layered on top: Sanctuary Pointe is in Triview Metropolitan District No. 4 and Promontory Pointe is in No. 2. Donala's service area includes Gleneagle, The Ridge at Fox Run and Struthers Ranch.
District lines can also run through the middle of everyday activity. At the Town of Monument's August 3 council meeting, staff said Triview has no bulk-fill station and gives its own hydrant meters to contractors, who don't always know which side of the district line they're drawing from. If a contractor can't tell, a buyer looking at a listing photo can't either. Check the address against the map before you write an offer.
How the shared plan came apart
The Loop was meant to bring water from Woodmoor's ranch near Fountain to northern El Paso County and share it among partners. Here's how the partnership wound down:
- December 2024: Cherokee Metropolitan District withdrew.
- July 20, 2026: Monument's council told staff to withhold a $219,815 Loop payment. It didn't take formal withdrawal action that night.
- August 3, 2026: The council passed Resolution 60-2026, 7-0, withdrawing from what the Monument Independent described as a roughly $200 million project based on a 2025 estimate. Its design plans were "not more than 50% complete."
- August 13, 2026: Donala passed Resolution 2026-6, ending its participation by October 31.
- September 24, 2026: The Loop board reported that after outstanding invoices were paid, it would have $98,500 left to fund its 2027 wind-down.
Monument's town manager said the town might still owe final costs and might not get back what it had already contributed. Cost estimates for the Loop also vary depending on when they were made. The Gazette reported an earlier construction estimate of $160 million to $190 million. Each of the four boards decided what it thought was best for its own customers. Those decisions are why the four providers now stand in such different places.
Four providers, four starting points
| Provider | Areas named in sources | Renewable status, Oct. 2026 | Recurring renewable charge | Next known step |
|---|---|---|---|---|
| Triview Metropolitan District | Jackson Creek area, Sanctuary Pointe, Promontory Pointe | Northern Delivery System operating since August 2024 | $48/month "Renewable Water Fee" base charge | Central Reservoir completion scheduled for April 2027 |
| Woodmoor Water & Sanitation | Woodmoor district map, lot by lot | Continuing a downsized Loop project alone | $40/month Renewable Water Infrastructure Fee, unchanged for 2026 | Board to choose a financing method with customer input |
| Town of Monument | Town utility service area; confirm by parcel | Pursuing renewable and reusable water; no source selected | None identified | Water Master Plan update underway |
| Donala Water & Sanitation | Gleneagle, The Ridge at Fox Run, Struthers Ranch | Studying water exchanges | None identified | 5% water and sewer increases recommended for 2027 |
Triview is the furthest along. Its 16-inch Northern Delivery System, built with Colorado Springs Utilities, has delivered renewable water since August 2024. Triview keeps its Denver Basin wells for peak summer demand and drought. In November 2025, the system supplied 69% of the district's water. Triview says its portfolio can cover more than 80% of future demand with renewable supply. In a September 2026 board report, the Central Reservoir at Stonewall Springs had a mining permit and contract and was scheduled for completion in April 2027. Triview customers already pay for this. The residential base charge is $48 a month and is labeled "Renewable Water Fee," and rates went up 6.5% on January 1, 2026.
Woodmoor owns the water but now has to build alone. The district bought its ranch in 2011. After years of revegetation work, its decree made more than 3,000 acre-feet a year available for municipal use. Its third-quarter 2026 newsletter says the project will continue with smaller, reconfigured infrastructure, on a timeline that "will probably have to stretch a number of years." The board still has to choose how to finance it, "with input from our customers." In 2025, groundwater still made up 72.5% of Woodmoor's supply. For 2026, the $40 monthly Renewable Water Infrastructure Fee stayed the same, water base and volumetric rates rose 7%, and the sewer base fee rose 5%.
The Town of Monument raised water rates for the first time since 2020. The new rates took effect September 1. The increase skips the first 3,000 gallons a month, adds 10% for 3,001 to 24,000 gallons, and adds 15% above that. The town estimates that an average household using about 5,000 gallons a month will see its bill go from $96.36 to $99.25. Finance director Jennifer Phillips told the council that at the old rates, the water fund would "basically be in the negative by the end of 2029." She said the new rates are a temporary fix while the Water Master Plan moves forward. The town's water manager said in September that Monument is pursuing renewable and reusable water and plans to keep its wells as backup.
Donala has shifted from the Loop to water exchanges. One would pair treated water from the Upper Monument Creek Regional Wastewater Treatment Facility with Willow Creek Ranch water stored in Pueblo Reservoir. The other would use water from the Laughlin Ditch. District staff estimated the exchanges could meet all demand in an average-rainfall year. In a dry year, Donala would still pump its wells or buy water from Colorado Springs Utilities through an existing connection. A board member noted the exchanges would only work during narrow windows, such as snowmelt or flood flows. By September 10, the acting manager recommended pausing a project-manager RFP while the district looked at a possible ballot measure to raise its debt limit.
A fee on the bill shows the cost has started
It's easy to read the table as a ranking of monthly bills, with the $48 fee looking worst. The Town of Monument's own numbers point the other way.
In April, a consultant study presented to the council estimated what a new supply could cost the average residential ratepayer. Building new treatment infrastructure with other agencies, at about $25 million, came out to roughly $163 more per month. A town-led project came to $138 more. A new or expanded reservoir came to $246, and leasing water from another agency came to $306. These scenarios are preliminary. They came before the September rate change and before any master plan decision, and the council hasn't adopted any of them. They do show the size of cost the town is planning for.
That's how to read a bill across Monument right now. Triview's $48 and Woodmoor's $40 are part of a renewable transition that has already started and is being paid for in pieces. A Town or Donala bill without a similar line item hasn't avoided that cost. The town hasn't chosen a renewable source. Donala has identified exchange options, but they still need more analysis and water-law work, and no project or price has been approved. Woodmoor sits in between: it has the water rights and a fee, but its project financing is still open.
None of this predicts what any household will pay. It tells you which questions about a home are already settled and which are still open.
Using a slower market to ask
Buyers have more time to ask these questions than they did in the spring. The Gazette's October 4 report on Pikes Peak-area data showed 4,297 active listings in August 2026, nearly 4% more than in August 2025. With homes under contract factored in, supply was estimated at 4.5 to 6.5 months. The regional single-family median was $470,000 in August, down 2% from a year earlier and down every month since May. These are regional numbers, not Monument-only numbers. Still, more listings and longer timelines give buyers room to do due diligence. Before your inspection deadline, get answers to these:
- Which provider serves this exact parcel, according to that provider's own map?
- What did the last 12 months of water and sewer bills show, including any renewable fee?
- Which overlapping districts appear on the parcel's tax bill? The El Paso County Treasurer lists each district's levy separately, and the total bill combines all of them.
- What has the provider's board said in 2026 about rates for next year and about financing its water supply?
FAQ
Does leaving the Loop mean Monument or Donala customers avoid renewable water costs? No. The town is updating its Water Master Plan and still pursuing renewable sources, and Donala is studying exchanges and a possible debt-limit ballot measure. Neither has chosen a project or a final price.
Is Woodmoor's $40 monthly fee permanent? The fee is set for the 2026 rate year. Woodmoor hasn't said how it will finance the downsized project, and it says customers will be asked for input.
Does Triview's renewable supply mean no more wells? No. Triview keeps its Denver Basin wells for peak summer demand and drought.
Are Donala's rates going up in 2027? Staff recommended continuing 5% annual water and sewer increases for 2027, with refined estimates due in October. The board hadn't adopted a 2027 schedule when that was reported.
If you're comparing Monument homes on different sides of these district lines, Lux Estates can help you confirm the water provider for every address on your list and collect bill history and board records before your deadlines arrive. Schedule a consultation, and we'll go over the water questions for each home you're considering.
This article is general information, not legal, tax or financial advice. Consult a qualified professional about your situation.